Projects

 

Large Manhole Project Located In Central, UT

 

Potable Water Tank Located In Southern, UT (Using OBIC 1100PW NSF61 Certified)

 

Off-Line Sewer Gravel Trap Located In Central, UT (Using OBIC 5000)

 

7800 Square Feet Influent/Effluent Channels and Lift Station In Central ID

 

5500 Square Foot Water Tank in Central UT

 

12 Manholes in Western WY

Idaho job 17 manholes

 

Wyoming Job - Active infiltration stopped with lining

 

Utah job - OBIC 5000 Polyurethane Hybrid

 

Idaho manhole - 250,000 GPD infiltration stopped with lining, 1million GPD flow-through plugs installed

 

Major infiltration next to river in Salt Lake City, UT 

 

UT project - 15 manholes

 

Potable Water Tank using OBIC 1100PW , Norther UT

 

Two manholes with sever H2S corrosion in Southern ID

 

New Lift Station and Manholes in Norther Nevada

 

Lift Station Rehab in Northern Utah